Delivering Precision in Mechanical Coordination for a Landmark Commercial Fit-Out
Introduction
A cutting-edge commercial office development designed to meet NZEB standards, targeting BREEAM Excellent and LEED Platinum certifications. We contributed mechanical coordination, construction drawings, and an as-built asset model, ensuring seamless integration of base build and fit-out services.
Type
Commercial Office
Area
40,000 square meter
Location
Dublin, Ireland
Scope
Mechanical coordination and construction drawings, COBie information, As built asset model
Input
Tender design drawings
Output
Fully coordinated construction drawings, Equipment schedules, COBie sheets, As built model.
Challenges Faced
Coordinating base build services with existing steel castellations using scan data to ensure seamless integration.
Managing simultaneous installation of base build and fit-out services without delays or conflicts.
Navigating limited ceiling void space to optimize mechanical system placement and avoid clashes.
Value Presented
Enhanced coordination and clash detection using base build service scans for seamless integration.
Accurate sequencing of base build and fit-out phases, ensuring smooth execution and reduced rework.
Efficient progress tracking and material management with detailed weekly reports and schedules.